J&K LG Manoj Sinha attended Foundation Stone Laying & Commencement of work for 4 NH Projects of total length 121 KM with an Investment of 3612 Cr, by Union Minister Nitin Jairam Gadkari & Union MoS General (Retd.) V.K. Singh.

46

Kashmir will be connected to Kanyakumari by train in December 2022. Today roads are being built at a much faster pace than ever before. This year a target of 8000 km of macadamisation has been set. J&K UT fares third in the whole country in terms of road construction: LG

In the last one year,11 tunnel projects have been approved.4 tunnels will be built on Chenani-Kishtwar highway at a cost of Rs10,000cr. To modernise Jmu-Sgr NH,tunnels will be built at a cost of Rs 4000 cr, besides 5 flyovers will be built in the UT at a cost of Rs 3000cr: LG